Skip to content
HRBiHSLEN Request a quote

Advice

Short guides for developers, contractors and designers – from door markings to the documents needed for building inspection.

Advice

What Croatian regulations require for fire doors

Class relative to the wall, self-closing, stair doors, width and panic hardware – under Croatian rules.

Read more
Advice

Preparing the opening for fire doors

Opening size, tolerances, wall and rebate – so the door fits without cutting or chiselling.

Read more
Advice

Fire doors in a house: garage and boiler room

Garage, boiler room and fuel store – where fire doors in a house really protect the family.

Read more
Advice

Apartment entrance doors: when EI 30 is needed

When apartment entrance doors must be fire-rated, and how to get burglar protection as well.

Read more
Advice

Fire door maintenance: what to check

A short checklist for building managers and maintenance – from closers to seals and panic hardware.

Read more
Advice

Doors on escape routes

Class, smoke, self-closing and panic hardware – doors that give people time to get out.

Read more
Advice

Why installation is part of fire protection

Doors are tested together with the wall and fixing – what is and is not allowed.

Read more
Advice

Fire doors for boiler rooms

EI class, self-closing, opening direction and ventilation – what to watch with boiler room doors.

Read more
Advice

What do EI2 60, S200 and C5 mean?

E, I, I₂, S200, C5 – how to read a fire door class in a bill of quantities.

Read more
Advice

What does the price of fire doors depend on?

Class, size, hardware, colour and quantity – and how to get an accurate quotation with no surprises.

Read more
Advice

Documents for building inspection

Certificate, declaration of performance, door label and installer's statement – what to prepare.

Read more
Contact

Request a quote

Describe what you need or paste the items from your bill of quantities. We reply to emails within two hours on working days and send quotations the same day, or within 24 hours at the latest.

Zlatko Matanović at his desk
Behind every quotation is our team – since 2010.
Attach your bill of quantities, drawings or photos below – or e-mail them to info@rigor.hr.
Attachments
No files chosen
PDF, JPG, PNG, Excel, Word or DWG – up to 5 files, 10 MB in total.